Category
Tags
Filter by Date

For the Latest Updates, Please Join Our Channel 

Comprehensive 4-Pillar Approach to Strengthen Shipbuilding, Maritime Financing, and Domestic Capacity

No: --, Dated: Sep 24, 2025
Recognizing the strategic and economic importance of the maritime sector, the Union Cabinet, chaired by Prime Minister Shri Narendra Modi, today approved a comprehensive package of Rs.69,725 crore to revitalize India’s shipbuilding and maritime ecosystem. The package introduces a four-pillar approach designed to strengthen domestic capacity, improve long-term financing, promote... Full Document
State India

Cabinet approves Construction of 4-lane Sahebganj-Areraj-Bettiah section of the NH-139W in Bihar on Hybrid Annuity Mode (HAM) with a total project length of 78.942 km worth Rs.3,822.31 crore

No: ---, Dated: Sep 24, 2025
The Cabinet Committee on Economic Affairs chaired by the Prime Minister Shri Narendra Modi today has approved the Construction of 4-lane Sahebganj-Areraj-Bettiah section of the NH-139W in Bihar on Hybrid Annuity Mode (HAM) with a total project length of 78.942 km and total capital cost of Rs.3,822.31 crore. The proposed four-lane... Full Document
State India

Cabinet approves doubling of Bakhtiyarpur – Rajgir – Tilaiya single railway line section (104 Km) in Bihar with total cost of Rs. 2,192 crore

No: --, Dated: Sep 24, 2025
The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi, has approved the doubling of Bakhtiyarpur – Rajgir – Tilaiya single railway line section (104 km) in Bihar with total cost of Rs. 2,192 crore (approx.). The project covering four Districts in the state of Bihar will... Full Document
State India

Cabinet approves doubling of Bhagalpur – Dumka – Rampurhat single railway line section (177 Km) in Bihar, Jharkhand and West Bengal with total cost of Rs. 3,169 Crore

No: --, Dated: Sep 10, 2025
The Cabinet Committee on Economic Affairs chaired by the Prime Minister Shri Narendra Modi today has approved the doubling of Bhagalpur – Dumka - Rampurhat single railway line Section (177 km) in Bihar, Jharkhand and West Bengal with total cost of Rs.3,169 crore (approx.). The enhanced line capacity will improve mobility,... Full Document
State India

Cabinet approves construction of 4-lane greenfield access-controlled Mokama-Munger section of the Buxar-Bhagalpur High-Speed Corridor in Bihar

No: ---, Dated: Sep 10, 2025
Cabinet approves construction of 4-lane greenfield access-controlled Mokama-Munger section of the Buxar-Bhagalpur High-Speed Corridor in Bihar on Hybrid Annuity Mode (HAM) with a total project length of 82.4 km with an outlay of Rs. 4447.38 Crore The Cabinet Committee on Economic Affairs chaired by the Prime Minister Shri Narendra Modi today... Full Document
State India

Cabinet approves Rs.1,500 crore Incentive Scheme to promote Critical Mineral Recycling in the country

No: --, Dated: Sep 03, 2025
The Union Cabinet chaired by the Prime Minister Shri Narendra Modi today approved a Rs.1,500 crore Incentive Scheme to develop recycling capacity in the country for the separation and production of critical minerals from secondary sources. This scheme is part of the National Critical Mineral Mission (NCMM), which is aimed at... Full Document
State India

Cabinet approves submission of bid for the Commonwealth Games (CWG) 2030

No: ---, Dated: Aug 27, 2025
The Union Cabinet, chaired by Prime Minister Shri Narendra Modi approved the proposal of the Ministry of Youth Affairs & Sports for submission of bid for the Commonwealth Games (CWG) 2030. It also gave its approval to sign the Host Collaboration Agreement (HCA) along with the required Guarantees from concerned Ministries,... Full Document
State India

केंद्रीय मंत्रिमंडल ने पीएम स्ट्रीट वेंडर्स आत्मनिर्भर निधि (पीएम स्वनिधि) योजना के पुनर्गठन और ऋण अवधि को 31 दिसंबर 2024 से आगे बढ़ाने को मंजूरी दी

No: ---, Dated: Aug 27, 2025
प्रधानमंत्री श्री नरेन्द्र मोदी की अध्यक्षता में केंद्रीय मंत्रिमंडल ने ‘प्रधानमंत्री स्ट्रीट वेंडर आत्मनिर्भर निधि (पीएम स्वनिधि) योजना’ के पुनर्गठन और ऋण अवधि को 31 दिसंबर 2024 से आगे बढ़ाने को मंजूरी दी है। यह ऋण अवधि अब 31 मार्च, 2030 तक बढ़ा दी गई है। इस योजना का कुल... Full Document
State India

Cabinet approves multi-tracking of 3 projects benefitting Karnataka, Telangana, Bihar & Assam and One new rail line to connect far flung areas of Kutch, Gujarat

No: ---, Dated: Aug 27, 2025
The Union Cabinet, chaired by the Prime Minister Shri Narendra Modi approved Four projects of Ministry of Railways with totalcost of Rs. 12,328 Crore (approx.). These projects include: - (1)  Deshalpar – Hajipir – Luna and Vayor – Lakhpat New Line (2)  Secunderabad (Sanathnagar) – Wadi 3rd and 4th Line (3)  Bhagalpur – Jamalpur 3rd line      (4)  Furkating – New Tinsukia Doubling The above projects aim to... Full Document
State India

Cabinet approves construction of 6-Lane Access-Controlled Capital Region Ring Road (Bhubaneswar Bypass, 110.875 km) in Odisha on Hybrid Annuity Mode (HAM) at capital cost of Rs.8307.74 crore

No: ---, Dated: Aug 19, 2025
The Cabinet Committee on Economic Affairs chaired by the Prime Minister Shri Narendra Modi today has approved construction of 6-Lane Access-Controlled Capital Region Ring Road (Bhubaneswar Bypass - 110.875 km) in Odisha on Hybrid Annuity Mode (HAM) at a total capital cost of Rs.8307.74 crore. Currently, connectivity between Rameshwar to Tangi... Full Document
State India

Cabinet approves development of Green Field Airport at Kota-Bundi (Rajasthan) at an estimated cost of Rs.1507.00 Crore

No: ---, Dated: Aug 19, 2025
The Cabinet Committee on Economic Affairs chaired by the Prime Minister Shri Narendra Modi today has approved the proposal of Airports Authority of India (AAI) for development of Green Field Airport at Kota-Bundi (Rajasthan) at an estimated cost of Rs.1507.00 Crore. Kota, situated on the banks of the Chambal River, is... Full Document
State India

Cabinet approves Lucknow Metro Rail Project of Phase-1B of the length 11.165 Km consisting 12 Metro Stations with an outlay of Rs.5,801 crore

No: ---, Dated: Aug 12, 2025
The Union Cabinet chaired by the Prime Minister, Shri Narendra Modi, has approved the Phase-1B of Lucknow Metro Rail Project, Uttar Pradesh with corridor for a length of 11.165 Km with 12 stations - 7 Underground and 5 Elevated. On operationalization of Phase-1B, Lucknow city will have 34 Km of... Full Document
State India

Cabinet approves semiconductor manufacturing units in ODISHA, PUNJAB and ANDHRA PRADESH with an outlay of Rs.4600 crore

No: ---, Dated: Aug 12, 2025
The Union Cabinet chaired by Prime Minister Shri Narendra Modi approved four more semiconductor projects under India Semiconductor Mission (ISM). Momentum is building up in semiconductor ecosystem in India with the six approved projects already in various stages of execution. These four proposals approved today are from SiCSem, Continental Device India... Full Document
State India

Cabinet approves Investment Proposal for construction of 700 MW Tato-II Hydro Electric Project in Shi Yomi District of Arunachal Pradesh with an outlay of Rs.8146.21 crore and completion period of 72 months

No: ---, Dated: Aug 12, 2025
The Cabinet Committee on Economic Affairs chaired by the Prime Minister Shri Narendra Modi today has approved investment of Rs.8146.21 crore for construction of Tato-II Hydro Electric Project (HEP) in Shi Yomi District of Arunachal Pradesh. The estimated completion period for the project is 72 months. The project with an installed... Full Document
State India

Cabinet approves Four New Components under the existing Central Sector Scheme of Special Development Packages (SDPs) for Assam and Tripura with a total outlay of Rs.4,250 crore

No: ---, Dated: Aug 08, 2025
The Union Cabinet chaired by the Prime Minister, Shri Narendra Modi, has approved four new components under the existing Central Sector Scheme of Special Development Packages (SDPs) for Assam and Tripura with a total outlay of Rs.4,250 crore. Details: Rs.500 crore for development of infrastructure in Adivasi inhabited villages/areas of Assam as... Full Document
State India

Cabinet approves Budgetary Support for Multidisciplinary Education and Research improvement in Technical Education (MERITE) Scheme with an outlay of Rs.4200 crore

No: --, Dated: Aug 08, 2025
The Union Cabinet chaired by the Prime Minister, Shri Narendra Modi, has approved the proposal for implementation of the ‘Multidisciplinary Education and Research Improvement in Technical Education’ (MERITE) Scheme in 275 technical institutions comprising 175 engineering institutions and 100 polytechnics. The objective of the scheme is to improve the quality,... Full Document
State India

Cabinet approves Rs 30,000 crore as compensation to Public Sector Oil Marketing Companies for losses in Domestic LPG

No: ---, Dated: Aug 08, 2025
The Union Cabinet chaired by the Prime Minister, Shri Narendra Modi, has approved compensation amounting to Rs.30,000 crore to the three Public Sector Oil Marketing Companies (IOCL, BPCL & HPCL) for the under- recoveries incurred on sale of domestic LPG.  The distribution of the compensation within the OMCs will be... Full Document
State India

कैबिनेट ने प्रधानमंत्री उज्ज्वला योजना के उपभोक्ताओं के लिए 2025-26 तक 12,000 करोड़ रुपए की लक्षित सब्सिडी जारी रखने को मंजूरी दी

No: --, Dated: Aug 08, 2025
प्रधानमंत्री श्री नरेन्द्र मोदी की अध्यक्षता में केंद्रीय मंत्रिमंडल ने वित्त वर्ष 2025-26 के दौरान प्रधानमंत्री उज्ज्वला योजना (पीएमयूवाई) के लाभार्थियों को प्रति वर्ष 9 रिफिल (5 किलोग्राम सिलेंडर वालों के लिए आनुपातिक रूप से) के लिए 14.2 किलोग्राम सिलेंडर पर 300 रुपए की लक्षित सब्सिडी को मंजूरी दी है। इसमें 12,000 करोड़ रुपए की लागत आएगी प्रधानमंत्री उज्ज्वला योजना : प्रधानमंत्री उज्ज्वला योजना (पीएमयूवाई)... Full Document
State India

Cabinet approves construction of 4-lane Marakkanam – Puducherry (NH-332A) in Tamilnadu on Hybrid Annuity Mode with an outlay of Rs.2157 crore

No: --, Dated: Aug 08, 2025
Cabinet approves construction of 4-lane Marakkanam – Puducherry (NH-332A) in Tamilnadu on Hybrid Annuity Mode with an outlay of Rs.2157 crore The Cabinet Committee on Economic Affairs chaired by the Prime Minister has approved construction of 4-lane Marakkanam – Puducherry (46 km) in Tamilnadu. The project will be developed on Hybrid... Full Document
State India

Cabinet approves total outlay of Rs.6520 crore including additional outlay of Rs.1920 crore for ongoing Central Sector Scheme “Pradhan Mantri Kisan Sampada Yojana” (PMKSY) during 15th Finance Commission Cycle (2021-22 to 2025-26)

No: --, Dated: Jul 31, 2025
The Union Cabinet chaired by the Prime Minister Shri Narendra Modi today has approved a total outlay of Rs.6520 crore including additional outlay of Rs.1920 crore for ongoing Central Sector Scheme "Pradhan Mantri Kisan Sampada Yojana" (PMKSY) during 15th Finance Commission Cycle (FCC) (2021-22 to 2025-26). Approval includes  (i)  Rs.1000 crore... Full Document
State India